{"id":5449,"date":"2025-03-17T01:12:21","date_gmt":"2025-03-17T01:12:21","guid":{"rendered":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/?post_type=project&#038;p=5449"},"modified":"2025-03-17T02:06:50","modified_gmt":"2025-03-17T02:06:50","slug":"north-shore-hospital-infrastructure-upgrade","status":"publish","type":"project","link":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/?project=north-shore-hospital-infrastructure-upgrade","title":{"rendered":"North Shore Hospital Infrastructure Upgrade"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Stockman General Contractors delivered a $10 million infrastructure renewal project at North Shore Hospital, addressing aging utility assets in a live hospital environment. The works included design oversight, installation of new water mains, modification of the main gas supply with hot tapping, and high-voltage cabling upgrades. Careful planning was required to coordinate traffic management, shutdown plans, and construction activities across multiple hospital departments, ensuring operations remained unaffected.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stockman General Contractors delivered a $10 million infrastructure renewal project at North Shore Hospital, addressing aging utility assets in a live hospital environment. The works included design oversight, installation of new water mains, modification of the main gas supply with hot tapping, and high-voltage cabling upgrades. Careful planning was required to coordinate traffic management, shutdown [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5479,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"class_list":["post-5449","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/project\/5449","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5449"}],"version-history":[{"count":2,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/project\/5449\/revisions"}],"predecessor-version":[{"id":5480,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/project\/5449\/revisions\/5480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=\/wp\/v2\/media\/5479"}],"wp:attachment":[{"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5449"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=5449"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/stockmangeneralcontractors.parallaxxapps.com\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=5449"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}